TotalEnergies has purchased West Burton ጉልበት , which owns and operates a gas-fired power station in ኖቲንግሃምሻየር በ450 ሚሊዮን ፓውንድ።
የዌስት በርተን ቢ ፋብሪካ እ.ኤ.አ. በ 2013 ተመርቷል እና በዩኬ ውስጥ በጣም የላቁ የኃይል ማመንጫዎች አንዱ ነው። ከሶስት ጥምር-ሳይክል ጋዝ ተርባይኖች (CCGT) አጠቃላይ 1.3 GW ምርት አለው እና በዩኬ ውስጥ ወደ 1.8 ሚሊዮን ቤቶች ያቀርባል። እ.ኤ.አ. በ 2018 49 ሜጋ ዋት አቅም ያለው የባትሪ ማከማቻ ስርዓት ወደ ፋብሪካው ተጨምሯል ።
The acquisition of flexible power generation capacity complements the renewable power generation that TotalEnergies has in the UK by enabling it to mitigate the intermittency and supply a stable stream of electricity to its customers. TotalEnergies, which makes the Total lubricant and metalworking range, currently has 1.1 GW of renewable generation with a further 4.5 GW in the works. To support this, the company has estimated it needs 700 MW in flexible power generation from gas, so it plans to sell half of the assets it has recently required.
TotalEnergies’ president for power and gas, Stéphane Michel, expressed his delight at welcoming the team at West Burton B, adding:
"ይህ ግዢ ታዳሽ እና ተለዋዋጭ የማመንጨት አቅምን በማጣመር በዩናይትድ ኪንግደም ውስጥ ላለው የተቀናጀ ስትራቴጂ አስተዋፅዖ ያደርጋል። የእኛን 1.1 GW Seagreen የባህር ዳርቻ የንፋስ ሃይል እርሻን ያሟላል እና የተቀናጀ የሃይል እንቅስቃሴያችንን በሃይል ማመንጫ፣ ንግድ እና ግብይት ውስጥ በዚህ ገበያ ውስጥ ልማትን እንድናፋጥን ያስችለናል።
አክለውም ስምምነቱ የኩባንያውን የ 12% የ ROACE ግብ በዚህ የንግድ አካባቢ ለማሳካት በቀጥታ ይረዳል ።
እንዲሁም ሊፈልጉት ይችላሉ፡-
Castrol collaborates to develop base oil from used lubricant
The ሕንድ operating arm of Castrol has partnered with the Hindustan Petroleum Corporation Limited (HPCL) on a new eco-conscious project.
TotalEnergies plastic recycling plant is first for ፈረንሳይ
Oil and gas major TotalEnergies recently launched ፈረንሳይ’s first advanced plastics recycling facility.